Construction of the Contres (41) waste collection center

Construction of the Contres (41) waste collection center

Construction of the Contres (41) waste collection center Client : SMIEEOM VAL DE CHER (41) The SMIEEOM Val de Cher chose Modulo Béton® for the construction of his new waste collection center. The platform permits to put 12 dumpsters. Under the platform, 6 storage...
Construction of a Data Center in Tours

Construction of a Data Center in Tours

Construction of a Data Center in (37) Client : OVH for SNCF OVH chose Modulo Béton for the construction of a Data Center.OVH chose the Modulo Béton modular solution because our buildings are fire resistant and their assembly in 1 week allows rapid commissioning....
Construction of a Data Center in Lille

Construction of a Data Center in Lille

Construction of a Data Center in Lille (59) Client : OVH OVH chose Modulo Béton for the construction of a Data Center.OVH chose the Modulo Béton modular solution because our buildings are fire resistant and their assembly in 1 week allows rapid commissioning. Surface...
Recycling center Le Plessis Bouchard

Recycling center Le Plessis Bouchard

Recycling center Le Plessis Bouchard (95) Client : Syndicate Mixte Emeraude (95). As the syndicate has only one recycling center with 10 quays for all his territory, it had to be enlarged because the traffic was almost impossible due to the too small size of the site...
Household waste recycling center Neuilly-sur-Marne (93)

Household waste recycling center Neuilly-sur-Marne (93)

Household waste recycling center Neuilly-sur-Marne (93) Project owner: GPGE Grand Paris Grand Est/Outer East Paris (93) Designing building and fitting a Household waste recycling center. The Local Public Body (EPT) for Outer East Paris (GPGE) did not have technical...